Estimating Performance Time for Air Force Military Construction Projects

Estimating Performance Time for Air Force Military Construction Projects

Paperback (04 Dec 2012)

  • $54.98
Add to basket

Includes delivery to the United States

10+ copies available online - Usually dispatched within 7 days

Publisher's Synopsis

The prediction of construction time performance is a problem of interest to both researchers and construction industry practitioners. This research seeks toidentify significant factors which may influence construction durations for Air Force Military Construction (MILCON) projects to establish a time predictionmodel. Data were collected for 856 MILCON projects completed between 1988 and 2004; this included both traditional facility and non-facility (e.g. airfieldpavements, utilities) projects. These data were analyzed using Bromilow's time-cost (BTC) model (1969) as well as multiple linear regression. Neither modelproduced acceptable results for non-facility projects; however, the multiple linear regression model was found to provide the most acceptable time predictionmodel for facility projects.As with the BTC model and previous research reported in the literature, there was a significant correlation between cost and duration. However, severalother factors were also identified that resulted in significantly lower than average construction durations.

Book information

ISBN: 9781288397778
Publisher: Creative Media Partners, LLC
Imprint: Biblioscholar
Pub date:
Language: English
Number of pages: 234
Weight: 426g
Height: 246mm
Width: 189mm
Spine width: 12mm